2 Line Eastside Bike Connector updated their map to include the new train stations opening today! If you’re seeing this on May 10th, you can go to the opening events!
Naturally, we’ve picked up the new version, and both Greater Northshore Bike Connector and MEGAMAP 1.7 – 10 May 2025 – are now available to download.
But this time, I have something to think about.
They've gone and changed their map key on me, and I'm not entirely sure what to do about that.