CLondoner92 (New Account)<p><a href="https://mastodonapp.uk/tags/Trains" class="mention hashtag" rel="nofollow noopener noreferrer" target="_blank">#<span>Trains</span></a> are now running again between Newquay and Par after Network Rail completed the third major phase of the Mid <a href="https://mastodonapp.uk/tags/Cornwall" class="mention hashtag" rel="nofollow noopener noreferrer" target="_blank">#<span>Cornwall</span></a> <a href="https://mastodonapp.uk/tags/Metro" class="mention hashtag" rel="nofollow noopener noreferrer" target="_blank">#<span>Metro</span></a> (MCM) project. This work, lasting four weeks, included building a new passing loop at Goss Moor, replacing 400m of track at St Blazey, repairing the 152-year-old Ponts Mill viaduct, and installing new signals between Newquay and Goonbarrow. Funded by the Government and Cornwall Council, MCM aims to improve local <a href="https://mastodonapp.uk/tags/transport" class="mention hashtag" rel="nofollow noopener noreferrer" target="_blank">#<span>transport</span></a>. The first phase will introduce hourly trains between Newquay and Par later this year, with coast-to-coast services planned for 2026. The project also includes upgrades to Goss Moor, allowing both local and long-distance trains to operate simultaneously. The viaduct repair was essential for safe, long-term operation. These improvements will significantly boost Cornwall’s rail service, benefiting residents, commuters, and tourists.<br><a href="https://www.networkrailmediacentre.co.uk/news/trains-running-again-to-newquay-after-major-work-completed-for-mid-cornwall-metro" rel="nofollow noopener noreferrer" translate="no" target="_blank"><span class="invisible">https://www.</span><span class="ellipsis">networkrailmediacentre.co.uk/n</span><span class="invisible">ews/trains-running-again-to-newquay-after-major-work-completed-for-mid-cornwall-metro</span></a></p>